Montazeri Power Plant
Data Center & Virtualization Project
Design and Implementation of the Data Center and Virtualization Infrastructure for Shahid Mohammad Montazeri Power Plant
Project Overview
The project for designing and implementing the data center and virtualization infrastructure of Shahid Mohammad Montazeri Power Plant was carried out with the goal of creating a stable, secure, and scalable platform for the organization’s IT services.
This project included the design and implementation of the data center’s physical infrastructure, the supply of processing and storage equipment, network infrastructure development, deployment of the virtualization platform, installation and configuration of security equipment, and complete operational training for the plant’s technical staff.
Given the critical importance of IT service stability in power generation industries, all equipment and implementation solutions were designed and executed in accordance with data center standards — ensuring increased reliability while allowing for future infrastructure expansion.
Design and Implementation of Data Center Infrastructure
In the first phase of the project, the power plant’s physical data center infrastructure was designed and implemented. This phase included the complete execution of the communications infrastructure, structured cabling, and preparation of equipment racks, carried out in accordance with data center standards and the plant’s 24-hour operational requirements.
Network termination
Keystone jack installation
Patch panel installation and arrangement
In-rack cable arrangement and management
Rack-mount equipment installation
Equipment labeling and documentation
Standard cable management implementation
Preparation for future data center expansion
Supply of Enterprise Servers
To build a powerful processing infrastructure, next-generation HPE ProLiant DL380 Gen10 enterprise servers were supplied for the plant’s data center. These servers were used to host virtual machines, organizational services, operational systems, and mission-critical software for the power plant.
Supply of Enterprise Storage System
To create centralized storage capacity, Dell EMC Unity 380 enterprise storage equipment was supplied and deployed for the plant’s data center. This storage system serves as the central repository for virtual machine data, files, databases, and organizational services.
Implementation of the Virtualization Platform
One of the most important parts of the project was the design and implementation of the data center’s virtualization infrastructure. In this phase, all of the plant’s required services were deployed on the virtual platform, enabling simpler management, increased availability, and optimal use of hardware resources.
Supply of Network and Security Equipment
To build a stable and secure network, Cisco enterprise networking and information security equipment — including enterprise switches, routing equipment, network communication devices, and firewalls — was supplied and installed for the plant’s data center. This equipment is responsible for protecting the network infrastructure, controlling traffic, and enhancing information security.
Routing equipment
Cisco Firewall
User access management
VLAN segmentation
Security policy enforcement
Installation, Deployment, and Training
Following the supply of equipment, all installation and deployment steps were carried out by technical specialists, concluding with complete training for the plant’s technical staff and the transfer of technical knowledge to the operating team.
Network equipment installation
Server installation
Storage installation
Equipment configuration
Performance testing
Final project handover
Complete staff training
Technical knowledge transfer
Summary of Supplied Items and Equipment
Project Achievements
The implementation of this project enhanced the IT infrastructure of Shahid Mohammad Montazeri Power Plant and established a stable, secure, and scalable data center.